Signed contracts are below 80% of the total (approx. 24 people)
Priority 2 Medium Processing
Signed contracts are from 80% to 115% of the total (approx. 24~34 people)
Priority 3
Signed contracts are over 115% of the total (> 34 people)
Note: The total number of people is the institution's currently allocatable quota (30). P1≈80%, P2≈80%~115%, P3>115%.Detailed news explanation
Overview
Introduction
SPC first opened its doors in Cairns city in 2001 and never stopped growing. Against all odds moved to Kewarra Beach in 2011, a residential suburb north of Cairns to ensure students can focus their energy on developing their English skills in a quiet and peaceful location on a short bike ride from the beach.
The school's visa assessment level determines the risk level for students applying for a visa and is a significant reference.
For example, if a school's visa assessment level is 2, the applicant will face more restrictions and be required to provide more written evidence, such as proof of language proficiency and financial capacity.